THE WORLD BEHIND A BAG
From small granules to jewel bags: discover the production process through which our creations are made.
TRANSPARENCY AT EVERY STEP
It is very important for us to tell every aspect of the making of our products because it helps us to convey the intrinsic value that makes our bags so special.
A PERFECT ASSEMBLY LINE
Discover all the steps of our production by watching this video on our instagram profile ♡

PHASE 1: THE FOUNDATIONS
Total time spent: 1 - 2 days
(24 - 48 hours)
1. RESIN GRANULES – The fundamental material and the starting point of our production.

2. COLOR CHOICE – The granules are chosen based on the color of the components we want to create.

3. WEIGHING – At this point the material is weighed and placed in special metal trays.

4. PREPARATION – The granules are placed in special ovens to eliminate any residual humidity.

5. FUSION – Once ready, they are inserted into electrical machines inside which the fusion process takes place.

6. MOLD – We choose the ideal mold based on the shape of the components we want to create.

7. CREATION – Through the use of these "skeletons" the liquid is transfused into the molds where it solidifies and takes the desired shape.

8. RECYCLING – The skeletons are manually discarded, reduced to granules and reused to create new components.

PHASE 2: THE REFINEMENT
Total time spent: 1 - 3 days
(24 - 72 hours)
9. TUMBLING – The components are subjected to a centrifuging process that smoothes them, eliminating any remaining imperfections.

10. FINAL STEPS – At this point our components are smooth but opaque, almost ready to be assembled.

11. POLISHING – We insert them into these wooden machines where, together with sawdust and a special polishing paste, they are subjected to a rotary movement that can last from 1 to 3 days.

READY 2 GO
The surface is smooth, the shape is perfect,
the color is the desired one.
Now our components are ready to be assembled :)

PHASE 3: THE ASSEMBLY
Total time taken: 1 - 30 days
(based on the quantity of models to be produced)
Assembly – The individual components are assembled together using the "Ringlink" technique.

Finishing – The last step of our production involves finishing all the details, applying our logo and "stress testing" each model.

The essential ingredient is passion♡
- Always BiMOR

NEED HELP?
We're here for you!
-
0105304322
-
Piazza Dante 23r, Genova, Genova, Italy
- Follow us on Instagram
-
Monday - Friday, 09 - 18